AiCool monobloc production in Poland

Home » Become a distributor

Become a distributor

Waiting 9 weeks for delivery from your current supplier? Switch to monoblocs ready in 4 weeks.

Gain a stable partner manufacturing monoblocs in Poland and secure your supply through the season.

We know this industry

Why you are losing customers and patience

Long lead times

Waiting 9 weeks or more for units your customer needed yesterday?

Sales team overloaded

Does your team lose hours going through technical documentation and picking replacements?

Logistics problems

Do deliveries arrive late, or block your loading bay because of chaotic packing?

No support in season

In the summer peak, are you left with no deliveries and no plan B?

Our answer

What you gain with us

AiCool monobloc assembly line at the plant in Poland 01

A made-to-order monobloc in 4 weeks

Currently waiting up to 9 weeks for monoblocs? We manufacture our units in 4 weeks. Need a monobloc immediately? Ask us which model is already waiting in stock.

Aerial view of the AiCool plant in Bochnia 02

A second source for the season (your plan B)

In July, August and whenever production capacity is stretched, a dependable plan B pays for itself. We provide stable manufacturing and logistics support — add us to your supplier list and stop losing turnover to downtime.

An AiCool engineer designing a monobloc in CAD software 03

Our engineer selects the monobloc based on your requirements

Send us the model code of the unit you are waiting for, or just three figures: cold room volume, operating temperature and ambient temperature. Within 24 hours we send back a replacement proposal with the EN 12900 performance table, installation dimensions and drawings. Your team spends no time on analysis — it gets a finished solution.

AiCool monoblocs being loaded onto a trailer by forklift 04

We deliver where it is needed, when it is needed

Delivery to the address you specify — your warehouse or your end customer's site, with a precise delivery slot. We pack orders for easy unloading at your end, so goods do not block your loading bay a minute longer than necessary.

Free selection

Send us the details for a replacement selection

All we need is the model code of the unit you are waiting for, or three figures about the cold room. Within 24 hours on business days we send back a replacement proposal with the EN 12900 performance table, installation dimensions and drawings.

  • An answer within 24 h on business days
  • EN 12900 performance table
  • Installation dimensions and drawings
  • No obligation, no charge
Technical drawing of an AiCool monobloc — a view of the internal layout
1

What do you need a replacement for?

2

Your contact details

3

Send the enquiry

Your data stays confidential. The selection is prepared by a qualified refrigeration engineer.

FAQ

Frequently asked questions

Do you offer discounts for regular partners and distributors?

Yes — for regular distributors we have dedicated partner price lists and flexible commercial terms.

How quickly do you ship orders from stock?

Models available from stock are dispatched within 24 hours.

Can I have the delivery sent directly to my customer?

Of course. We handle drop-shipping deliveries to the address you specify, with full logistical discretion.